Monday 30 November 2015

Architectural Drawing

Workshop 5 Archicectural Drawing
16 Nov, skip class beacause had beravement in my home. Workshop 5 was architectural drawing lesson which lerant to draw some human figure and some species of vegetations. Even I not attend the class but wish my drawing can be satisfied. But the way, I want to thanks my ID group members take times to teach me, Love you all:)

Monday 2 November 2015

PROJECT 4 SENSE OF PLACE: NEIGHBOURHOOD & COMMUNITY


Project 4A SITE ANALYSIS OF NEIGHBOURHOOD AREA
Site Analysis of  Neighbourhood Area

Project 4a is about site analysis of neighbourhood area. Location plan for my group was at Taman Pekaka, Penang while site plan was at the field of Taman Kejiranan Pekaka and two rolls terrace houses.  Before we start doing our site analysis we seperate in small group to make the job easier. In project 4a we need to find out physical and, land use types, layout and housing type, public open space, public facilities and so on.  
 
Therefore, my part was movement network. Network movement of Jalan Pekaka 1 was very busy. This is because there was a residential area and was the main road to Tesco, Sg. dua. We complete the job by counting the vehicles which pass through along the Jalan Pekaka 1 .Choosen time was 4pm ( normal period ) and 5.30pm ( after office hour), The time taken was 5 minutes each. By our observation we found that the network movement was very busy during the pick season ( office hour ). Besides, the road was lack of pedestrian and road notice board.

Overall, the conclusion for our site analysis we found that there was lack of parking site, sound pollution from vehicles and aeroplane and some of the street furniture are damage. 




PROJECT 4B NEIGHBOURHOOD LAYOUT PLAN

Neighbourhood Plan
This is my neighbourhood plan, This time our mission is a concept plan to develop only  50% ( about 2 to 3 acres ) at our site location area. Actually in 4B we just need to draw the developed part only buy using scale 1:500 but to make me easier i use the same with 4A which was scale 1: 750. 
This part was challenging for all me because I'm ID student don't have any knowledge in site planning. So it was troubled to me. I refer my 4A part as long as 2 days but still can't came ou tany ideas. Because of increasingly pushed for time, I just play put the arrangement of terrace house, semi terrace houses and bungalow liked playing puzzle.

So I chooose upper part for my new development. I add two rolls of double storey  terrace house which had 29 units, semi detached house 4 units and bungalow 1 unit. I also construct a open space that beside the bungalow have a garden and gazebo. That is a place for relaxing and jogging. Even I cot down the some of the trees at there but I replant with Ash Tree. Because Ash tree have functions to cool down the air temperature, adsorb dust and it can also reduce the sound pollution.