Wednesday 13 January 2016

MODULE PAVILION GROUP 4B



PAVILION REGIA DE CRYSTAL

Module,  Pavilion  Group 4b
Finally, our module complete~At here, I very appreciated to my group members. I believe that,  this project bring a lot of troublesome to us. In the progress, we met several setbacks, toilsome, struggled and hurts. At the important moment ( the morning before submit), I want apologised at here because of my heartbreak and leave you guys o complete the module.I'm sorry guys~ But yours spirit never give up make me felt very touchful and grateful. 

The experience I gain in this project- team spirit.The purpose make a team are cor-poration and communication. Meant, had problems should spoke it out, have opinion please share it out. Don't keep silent and just said yes, ok, good...later play back talk. This was a bad attitude in a formation of group. So, I very lucky to sit with you guys in this project and most interesting part was I met my Idol at here, Aimi. She was a strong women and good leader. I very proud and glad to met her at here. Thanks lectures form this group. Thank you~~

  

Monday 28 December 2015

Project 7 Performance Night 2015/16

Costumes~~
HBP part time models~Haha!!
                 

HOHOHO~Performance Night 2015/2016 with theme A-L-I-V-E. We had 6 group which are zombies, vampires, mammies and so on. Is fun~Hope can continue with it~Yeah!!! Letis see hoe i alive, don't shock~1,2,3...

So shock when i heard I be the ID good performers. Thanks for support~Actually this is our real life in HBP ( scream!!!)!!!hehe~Good bye SEM 1 and say Hi to Exam..OHH NO!!!

PROJECT 6


ID MEMBERS

                                    


    GROUP 4B MEMBERS
    Finally we finished our project 5~Congrates to all and we did a good job~
    Especially thanks to Aimi, our group leader~
    This our group photo, happy and funny!!!
    Welcome to  ANETOS exibitions~

PROJECT 5A & 5B GROUP 4B


DESIGN CONCEPT


PROJECT 5A & 5B : PAVILION

Our site was located at Taiping Lake Garden, Perak. Network movement for our site consist of 7m wide two ways road and 20.5m walk ways pendestrian. The  average side's wind velocity is 2.0 m/s, direction of wind is come from north west. While  average temperature is 33 dec celcious with humidity ranging from 53%- 67%. Range for solar radiation is from 30.44 k/lux to 68.75 k/lux.

Our design concept was came from a hockey ball then we developed into a half dome shape. The most attracted part for this building was it will form a fully dome structure  when the structure facade is reflected on the lake especially at the night scene will more artificial with lighting effect.

INTETIOR DESIGN

For the interior part, the concept i used was islamic modern. The pavilion consist 4 parts that are reception area, lounge area area and two gallery area. The theme colors are  gold, brown n white. In detail, at the center of pavilion  consist a small gallery-spriral shape of partition wall which make by PU with islamic geometric design patterns. The focus point for interior part is Sultan Azlan Shah Cup Sculture, 2m height at the small gallery area.

Monday 30 November 2015

Architectural Drawing

Workshop 5 Archicectural Drawing
16 Nov, skip class beacause had beravement in my home. Workshop 5 was architectural drawing lesson which lerant to draw some human figure and some species of vegetations. Even I not attend the class but wish my drawing can be satisfied. But the way, I want to thanks my ID group members take times to teach me, Love you all:)

Monday 2 November 2015

PROJECT 4 SENSE OF PLACE: NEIGHBOURHOOD & COMMUNITY


Project 4A SITE ANALYSIS OF NEIGHBOURHOOD AREA
Site Analysis of  Neighbourhood Area

Project 4a is about site analysis of neighbourhood area. Location plan for my group was at Taman Pekaka, Penang while site plan was at the field of Taman Kejiranan Pekaka and two rolls terrace houses.  Before we start doing our site analysis we seperate in small group to make the job easier. In project 4a we need to find out physical and, land use types, layout and housing type, public open space, public facilities and so on.  
 
Therefore, my part was movement network. Network movement of Jalan Pekaka 1 was very busy. This is because there was a residential area and was the main road to Tesco, Sg. dua. We complete the job by counting the vehicles which pass through along the Jalan Pekaka 1 .Choosen time was 4pm ( normal period ) and 5.30pm ( after office hour), The time taken was 5 minutes each. By our observation we found that the network movement was very busy during the pick season ( office hour ). Besides, the road was lack of pedestrian and road notice board.

Overall, the conclusion for our site analysis we found that there was lack of parking site, sound pollution from vehicles and aeroplane and some of the street furniture are damage. 




PROJECT 4B NEIGHBOURHOOD LAYOUT PLAN

Neighbourhood Plan
This is my neighbourhood plan, This time our mission is a concept plan to develop only  50% ( about 2 to 3 acres ) at our site location area. Actually in 4B we just need to draw the developed part only buy using scale 1:500 but to make me easier i use the same with 4A which was scale 1: 750. 
This part was challenging for all me because I'm ID student don't have any knowledge in site planning. So it was troubled to me. I refer my 4A part as long as 2 days but still can't came ou tany ideas. Because of increasingly pushed for time, I just play put the arrangement of terrace house, semi terrace houses and bungalow liked playing puzzle.

So I chooose upper part for my new development. I add two rolls of double storey  terrace house which had 29 units, semi detached house 4 units and bungalow 1 unit. I also construct a open space that beside the bungalow have a garden and gazebo. That is a place for relaxing and jogging. Even I cot down the some of the trees at there but I replant with Ash Tree. Because Ash tree have functions to cool down the air temperature, adsorb dust and it can also reduce the sound pollution.
 





Tuesday 20 October 2015

Workshop 4 Watercolor Painting

Workshop 4

Architect Watercolor Painting
Workshop 4-Watercolour exercise. The first thing to do is trace out the sketches. We not using tracing paper to trace it but we trace at window because we need the sunlight to sketch it out.

Next, we  we need use artists alpha watercolor to paint it. This movement was very excited and felt a bit tension. Fortunately, we have almost 10 volunteers second year senior taught us use the correct way to paint it. In the same time, I found that architect watercolor painting was totally different with fine art watercolor painting. Let said, works of fine art painting is thick and heavy with color. While the concept of architect watercolor painting is water+color= watercolor and focus on one point (must be sharp color) .

My focus point is the building. The direction of sunlight was came from left site. So, the left site od the building will be brighter while the covert space will be darker. I used blue color because it can shown in harmonic feel.